Aggrey & Associates Ltd presents the Hemanso Project, an alluvial gold mining opportunity located in the Twifo Atti-Morkwa Municipal District of Ghana's Central Region. The project is designed as a low-capex, short-cycle operation, targeting shallow gold deposits through scalable, mobile wash plant methods.
Quick Facts:
-
Location: Hemanso, Central Region, Ghana
-
Initial CAPEX: $225,000
-
Concession Size: 17 acres (0.1 km²)
-
Estimated Gold Output: 270.99 oz (8.42 kg)
-
Project Life: 4 months (based on current reserve estimates)
-
Licensing Status: In progress, expected by Q2 2025

Project Summary & Exploration Results
Over a 5-month exploration period, Aggrey & Associates conducted grab sampling and alluvial pitting, completing 7 pits ranging from 2.5m–6m deep.
Sampling Highlights:
-
Average gravel thickness: 0.63m
-
Overburden thickness: 3.64m
-
Defined ore material: 30,497.14 m³
-
Calculated grade: 0.28g/m³
-
Estimated recovery: 270.99 oz gold
Investment Use Breakdown
Items
Estimated Cost (USD)
Mobile Wash Plant (100 TPH)
$95,000
Generator (100 kVA)
$15,000
Water Pump + Piping
Excavator (Rental, 4 months)
Tipper Truck (Rental, 4 months)
$5,000
$28,000
$16,000
Site Mobilization/Prep
$5,000
Labor & Operations (4 months)
$40,000
Fuel, Maintenance, Security
$21,000
Total Investment
$225,000
Returns & Exit Plan
-
Gold Recovery Target: 270.99 oz
-
Gold Price Assumption: $1,950/oz
-
Gross Revenue: ~$528,000
-
Net Profit (after expenses): ~$300,000
-
ROI: ~133%
-
Payback: Within 4 months
Why Invest in the Hemanso Project?
✅ Low entry capital
✅ Shallow, easily accessible gold reserves
✅ Fast recovery period and early returns
✅ Simple, mobile processing setup
✅ Expansion potential on adjacent zones
Next Steps for Interested Investors
-
Full project presentation & financial model
-
Due diligence & site visit (upon request)
-
Draft investment agreement & JV options